Products

GREEN DUCT

GREEN DUCT is a Kitchen Extract Duct degreasing & odor treatment system. It was developed to provide a cost effective, safe and environmentally friendly alternative to expensive and cumbersome technologies such as UV or Misting Hoods. Proprietary technology allows GREEN DUCT to be installed or retro-fitted to virtually any existing Kitchen Extract Duct. By following the external run of the Kitchen Extract Duct with flexible piping, misting nozzles are placed intermittently inside the duct, from above the hood all the way to the duct extract point. These nozzles produce a fine degreasing mist, which disperses within the flow of air inside the duct. This degreasing mist follows the same path as grease particles, therefore reaching and eradicating all areas of grease deposits inside the duct. GREEN DUCT is a fine mist system that requires no duct drainage.

BASIC CONCEPT

  • Misting nozzles strategically positioned to treat areas of grease accumulations.
  • No hood or duct drainage points required.
  • No impact on air balancing

PRODUCT RANGE

Green Duct systems are available in 3 options: single circuit, dual circuit and multi-circuit. Dual and multi-circuits Green Duct systems were designed to treat multiple kitchen extract ducts using only one machine. From a value engineering stand point, dual and multi-circuit Green Duct systems are a highly cost effective option for commercial properties requiring kitchen extract duct degreasing and odor control for several F&B operations, such as in hotels, hospitals and malls.
  • A Variable Frequency Driver (VFD) enables Dual and Multi circuit units to maintain equal pressure along several independent misting lines at the same time.

SYSTEM OVERVIEW

Schematic 1. Single-Circuit System Overview: Schematic 2. Multi-Circuit Systems Overview:
  • Green Duct control panel operates the misting lines on daily sequential timers, set to treat ducts during peak cooking cycles
  • Control panel fitted with dry patch for BMS connection

Key Benefits

Green Duct installation keeps kitchen extract ducts grease-free 365 days a year:

Eliminates the source of combustible fuel inside the ducts. Reduces extract duct cooking and stagnant grease odors.

Green Duct compliance & standards

Complies with Dubai Civil Defense requirements for duct cleaning - eliminates the need for manual cleaning. Complies with DW172 & NFPA96 Kitchen Extract Duct installation standards.

Green Duct is a more cost efficient alternative to UV & misting hoods

Green Duct permanently eliminates all grease in ducts. UV & Misting Hoods don’t.

Green Duct is easy to install, requires no modification to hoods or extract fans

Can be pre-fit or retro-fit on existing projects, requires NO duct drainage points and has NO impact on air balancing. Works well in conjunction with Ecology & ESP Units to further reduce smoke and smell

MEET degreasing products is 100% biodegradable and environmental

NO chemicals, NO hazardous products, NO UV radiation and NO Ozone

External Duct Piping and Ball Valves

  • Standard fire rated kitchen extract duct access panels will be used to install and maintain green duct misting nozzles
  • 9.5mm polyamide pipe connects the installation to the Green Duct cabinet
  • High pressure ball valves allow for independent nozzle control and maintenance
  • 6mm fire rated copper piping is placed inside the duct, connected to the misting nozzles

Internal Duct Piping and Nozzles

  • The droplets size 10–25μm (microns) ensures there is no water condensation and no duct corrosion
  • Nozzles of variable flow rates can be selected according to extract airflow rates, duct dimensions and grease content
  • Flexible copper piping allows mist to be directed virtually anywhere
  • Nozzle configuration can be adjusted to the parameters of the duct (e.g. ring or cross configuration at the base of risers)

Manufactured in Italy to the highest EU standards

Manufactured exclusively for MEET, by IDROTECH SRL Italy (ISO 9001:2008) in accordance with CE directives:
  • 2004/108 CE Directive (EMC Directive) and subsequent amendments
  • 2006/95 CE Directive (Low Voltage Directive) and subsequent amendments
  • 2006/42 CE Directive (Machinery)

GREEN DUCT UNIT

Dosatron:

Product dosing system

Control Panel - main components:

Master Controller Switch PLC Controller (for programmable operation cycles & timers) VFD Controller (for independent line pressure management) Misting Line Selector Switches (for manual / auto control)

Product Tank:

25 or 50 Liter tanks for concentrated biological degreasing agent

Water filtration group:

Sediment filter (5 microns) Carbon filter (20 microns) Anti-calcium crystals Auto-Clean Selector Switch (for manual / auto control)

Motor pump group:

Single phase 220V / 50Hz 70 bar

Certifications

Code Description Total No nozzles MANAGEABLE No. LINES PUMP FLOW RATE (L/MIN) OPERATING PRESSURE (BAR) POWER (SINGLE PHASE) Cabinet Sizes (mm)
ICO-70S Single Circuit System (for one kitchen duct) < 22* 1 1 56-70 220V-50Hz,1.1kW 1600 x 800 x 500
ICO70M2-VAR Two Circuit System (for two kitchen ducts) < 30-82* 2 3.8 56-70 220V-50Hz,1.5kW 1800 x 1000 x 500
ICO70M4-VAR Four Circuit System (for four kitchen ducts) < 40-120* 4 5.6 56-70 220V-50Hz,2.2kW 1800 x 1000 x 500

Phoenicia Intercontinental (IHG)

Project Reference

Phoenicia Intercontinental Beirut

Project Name

Green Duct retro-fit project

Developers

SGHL & IHG

Operators

IHG

MEET Project Requirements

To provide and install seven (7) single-circuit Green Duct systems for the automated grease-free maintenance and odor control forthe seven F&B (7) outlets of the hotel.
Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with engineering department, full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

Two phase completion in 2004&system upgrades in 2010

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Le Vendome (IHG)

Project Reference

Le Vendome (IHG) –2012 kitchen renovations

Project Name

La petite Maison& Main kitchen

Developers

SGHL& IHG

Consultants:

CKP Hospitality Consultants

Operators:

SGHL – Le Vendome

MEET Project Requirements

To provide and install one (1) dual-circuit Green Duct systems for the automated grease-free maintenance and odor control of the two (2) kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2012

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Casper & Gambini’s (AntVentures Worldwide)

Location: Beirut, Lebanon

Year of Commission: 2009

Momo (Solidere)

Project Reference

Beirut Souks Development – Souks II

Project Name

Momoat the Souks - Beirut

Developers

Solidere& MATS

Consultants:

SKP – Samir Khairallah& Partners S.A.L. SDT – Service Design Technology

Contractors:

LEAD Construction – Construction Management & General Contracting

Operators:

BHD – Beirut Hospitality Company S.A.L. MATS – Momo at the Souks

MEET Project Requirements

To provide and install one (1) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of two (2) kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2010

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Gaucho Beirut

Project Reference

Gaucho Restaurants

Project Name

Gaucho Beirut

Developers

Gaucho Restaurants

Consultants:

NS&A – NagiSfeir& Associates S.A.L. Kamal J. Sioufi& Associates

Contractors:

K. ABBOUD FOR CONSTRUCTION S.A.R.L.

Operators:

Gaucho Restaurants

MEET Project Requirements

To provide and install one (1) Green Duct system for the automated grease-free maintenance and odor control of one (1) kitchen exhaust duct. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2010

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Le Stay (Solidere)

Project Reference

Beirut Souks Development – Souks II

Project Name

Le STAY, Beirut

Developers

Solidere& Group YannickAlleno

Consultants:

SKP – Samir Khairallah& Partners S.A.L. EQUIP Engineering & Contracting S.A.L.

Contractors:

LEAD Construction – Construction Management & General Contracting

Operators:

BHD – Beirut Hospitality Company S.A.L. MATS – Momo at the Souks

MEET Project Requirements

To provide and install one (1) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of two (2) kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2011

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Socrate Central Catering

Project Reference

Socrate Kitchens

Project Name

Central Catering Project

Developers

Socrate Restaurants

Consultants:

EM TECH – Electro-Mechanical Technology Co. s.a.r.l.

Contractors:

EM TECH – Electro-Mechanical Technology Co. s.a.r.l.

MEET Project Requirements

To provide and install two (1) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of four (4) kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2011

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Zaytunay Bay (Solidere)

Project Reference

Town Quay Development – Lot 1455

Project Name

Zaitunay Bay – Beirut Waterfront, Lebanon

Developers

Solidere& Partners

Consultants

iDEA – International Design Engineering and Architecture S.A.L. SDT – Service Design Technology

Contractors

SocieteMouawad-Edde S.A.R.L.

Operators

BWD – Beirut Waterfront Development S.A.L.

Tenants:

Senior Sassi, Chez Paul, Classic Burger, Karam Sur Mer, St. Elmo’s, Zabad, Amarres, Lina’s, Cosmo, Salmontini, CroMagnon, Monti Mahal, Capuccino Grand Café, Babel Sur Mer, Coffee Bean & Tea Leaf, HaagenDazs, My Waterfront

MEET Project Requirements

To provide and install three (3) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of all bass-build and 18 connecting tenant exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2011

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Mall of the Emirates (MAF Dalkia)

Project Reference

Mall of the Emirates

Project Name

Fashion Dome Extension – Green Duct retro-fit project

Developers

MAF Dalkia

MEET Project Requirements

To provide and install two (2) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of the bass-build exhaust ducts connecting to eight (8) tenant kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

Two phase completion in 2012 & 2014

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Sammach (Bin Hendi)

Location: Dubai,UAE

Year of Commission: 2011

Al Hallab Restaurants

Project Reference

Al Hallab Restaurants Dubai

Project Name

Retro-Fit Projects – Dubai Mall / Bab Al Bahr & Umm Ramool Central Catering

Developers:

Al Hallab Group

Contractors:

FALCON Professional Kitchen LLC

MEET Project Requirements

To provide and install three (3) single-circuit Green Duct systems for the automated grease-free maintenance and odor control of three (3) kitchen outlet exhaust ducts, as listed above.
Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

Three stage completion between 2012 & 2013

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Shakespeare & Co.

Project Reference

Shakespeareand Co. Restaurants Dubai

Project Name

Retro-Fit Projects – Dubai Marina Mall / Dubai Arabian Ranches

Operators

Shakespeare and Co.

MEET Project Requirements

To provide and install two (2) single-circuit Green Duct systems for the automated grease-free maintenance and odor control of the two (2) kitchen outlet exhaust ducts, as listed above.
Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design, full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

Two stage completion between 2011& 2012

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

KUFPEC Central Kitchen

Location: Kuwait City,Kuwait

Year of Commission: 2012

The Dubai Mall (EMAAR Malls Group)

Project Reference

TDM - The Dubai Mall

Project Name

Mall base-build extract ducts - Green Duct retro-fit project

Developers

EMAAR Malls Group

MEET Project Requirements

To provide and install 26 multi-circuit and 3 single circuit Green Duct systems for the automated grease-free maintenance for all base-build ducts connecting to 87 tenant kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, full installation (including related duct works and civil works), testing, programming, commissioning, handover and operator basic training.

Project Completion

2013

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Waldorf Astoria The Palm (Habtoor Group)

Project Reference

Waldorf Astoria the Palm Dubai

Project Name

Habtoor Waldorf Project

Developers

Al Habtoor Group

Consultants

Khatib&Alami – Consolidated Engineering Company

Contractors

ASGC – Al Sharaf General Contracting

Operators

Hilton Group

MEET Project Requirements

To provide and install two (1) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of four (4) kitchen exhaust ducts.
Annual maintenance contract of Green Duct systems and related installation.
Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2013

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Beirut Yacht Club

Project Reference

Town Quay Development – Lot 1456

Project Name

Yacht Club Building – Beirut Waterfront, Lebanon

Developers

Solidere& Partners

Consultants:

iDEA – International Design Engineering and Architecture S.A.L. SDT – Service Design Technology

Contractors:

A. R. Hourie S.A.L.

Operators:

BWD – Beirut Waterfront Development S.A.L.

MEET Project Requirements

To provide and install one (1) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of two (2) independent kitchen exhaust ducts.

MEET Scope of Work:

Units to location, liaising with contractors / sub-contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2013

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Rosewood Hotel - Abu Dhabi

Project Reference

Rosewood Hotel – Abu Dhabi

Project Name

Green Duct retro-fit for Sambusek Restaurant

Developers

Mubadala Real Estate

Operators

Rosewood Group

MEET Project Requirements

To provide and install two (2) single-circuit Green Duct systems in tandem for the automated grease-free maintenance and odor control of Sambusek restaurant.
Annual maintenance contract of Green Duct systems and related installation.
Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with engineering department, full installation, testing, programming, commissioning, handover and operator basic training.

Project Completion

2014

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)

Beirut Souks (Solidere)

Project Reference

Beirut Souks Development – Souks III

Project Name

Khan Antoun Entertainment Projects

Developers

Solidere& Partners

Consultants

Khatib&Alami – Consolidated Engineering Company
EM TECH – Electro-Mechanical Technology Co. s.a.r.l.

Contractors

GENECO S.A.R.L.

Operators

CinemaCity& multiple independent F&B operations

MEET Project Requirements

To provide and install two (2) multi-circuit Green Duct systems for the automated grease-free maintenance and odor control of seven (7) kitchen exhaust ducts. Annual maintenance contract of Green Duct systems and related installation. Provision of biological degreasing and odor neutralizing consumables.

MEET Scope of Work:

Units to location, liaising with contractors / sub - contractors, incorporation of drawings to design (shop and as-built) full installation, testing, programming, commissioning, handover and operator basic tra

Project Completion

2014 and ongoing

Reference

Model: Green Duct. Manufacturer: Middle East Environmental Technologies (www.meetholding.com)